For sale a program of off-plan villas (not built) in the charming region of Mont Mascal.
Details | Close to beach, close to shops, car park |
Address | GRAND BAIE - PEREYBERE - POINTE AUX CANNONIERS |
Type | Sales |
Category | House / Villa 3 bedrooms |
Car park | Oui |
Conseiller immobilier | Noémie V. DAUHOO |
Tel. Business | (+230) 5 252 9935 |
Number mandate | 2495GB |
Voir les autres annonces qui peuvent vous intéresser
LOT AVAILABLE: two lots of 6.1 perches at Rs 7.1M
Discover an exceptional opportunity to become the owner of a villa (unfurnished) in Grand Baie! Our SCIA project offers you the opportunity to invest gradually at your own pace until your house takes shape.
Whether you are looking for a rental investment or want to offer your children a bright future, this project is for you. These villas will be built on spacious grounds offering an ideal setting for family life.
Characteristics of the Villas:
• 3 en-suite bedrooms with dressing room.
• Downstairs bedroom perfectly suited for guests or elderly people.
• Your own private swimming pool (optional with an additional charge of Rs 250,000 + VAT).
• Relax on the terrace on balmy summer evenings.
• A small garden invites you to warm gatherings with family or friends.
Reference: 2495GB
Price: Rs 7,100,000 INCLUDES registration fees and agency fees, EXCLUDES notary fees Rs 200,000.
The start of work August 2024.
Payment Plan:
Deposit: Rs 2,840,000
Funding calls will come by construction phase and you will make the transfer to the notary's account. the latter will ask for your agreement to release the funds once the QS (quantity surveyor) report has been received.
TURNKEY: around July 2025
STAGE 1 - SIGNATURE OF CRP AND SCP
(1) Signature of CRP (Client Reservation Document) - 15%
(2) Signature of SCP (Societe Civile et Particuliere) - 25%
STAGE 2 - CONSTRUCTION
(1) Advance Payment required and mandatory for start of site set up and Construction of Floor Bed - 10%
(2) Upon completion of First Floor Slab - 14%
(3) Upon completion of Roof Slab and Concrete Staircase - 14%
(4) Upon completion of Boundary Wall, Manhole and Septic - 12%
(5) Upon completion of Internal Rendering - 10%
(6) Upon completion of External Rendering, Painting, Manhole and Septic and advance for Infrastructure Cost - 16%
(7) Upon completion of final painting, Rock Deco, Wooden Works and Aluminum - 20%
(8) Upon completion of Landscaping and Fixation of Gate - 4%
STAGE 3 - FINISHING
(1) Advance payment required and mandatory for finishing works supply and fixation - electric, plumbing, sanitary ware, laminating flooring, tiles, solar water heater, water pump, water tank, equipped kitchen order and set up, blinds, flush doors, outdoor setting set, barbecue grill apparatus, CCTV cameras, motorized gate - 60%
(2) Completion for finishing works supply & fixation - electric, plumbing, sanitary ware, laminating flooring, tiles, solar water heater, water pump, water tank, blinds, flush doors, outdoor sitting set, barbecue grill apparatus - 30%
(3) Completion for finished works supply and fixation - equipped kitchen, CCTV cameras, motorized gate - 10%